Eastlake Street - Carrara - City Link Industrial
15ha Industrial Subdivision.
300,000m3 earthworks. 4,000m2 reinforced soil segmental retaining walls, generally5m high. External intersection upgrading. Design of flood volume compensation and management of flood conveyance. Design of external stormwater catchment conveyance. Design of deep sewer network including significant sewer diversions. Design and value engineering of water supply network.

Gold Coast Logistics Hub
Civil engineering consulting associated with major earthworks (350,000m3), reinforced earth retaining walls (5mhigh), infrastructure realignments, deep infrastructure construction, intersection upgrading and early site handover to stakeholders.
Engagement with the project consultant group informing a solution for completion of major earthworks whilst concurrently realigning a 110KV electrical supply within the site.
Value Engineering the geotechnical investigation works to establish the suitability of existing on-site road pavement gravels being re-used to meet Council construction specifications. Critical appraisal was also undertaken of suitable retaining wall types in consideration of Council guidelines, geotechnical conditions, site constraints, surcharge loading, aesthetics and lifespan.

Leda Drive, Burleigh Heads
.

Ourimbah, Tweed Heads

Avalon Parade, Miama
Project for The Potter Group

Wollongbar Street, Byron Bay
Project for The Potter Group. Industrial development including warehouse and self storage facilities.

Kortum Drive, Burleigh Heads
Industrial development in Burleigh heads – Civil engineering and access grading design

Tweed Heads NSW
Low Impact Industry design including management of stormwater conveyance to maximise site yield.

Burleigh Mancaves
‘Burleigh Base’ – A Potter Project’s development that comprises an architecturally designed complex 7 Strata Titled, Low Impact Industrial Self-Storage Man Caves in an A-grade location situated next door to Billabong HQ, in Burleigh’s commercial hub. The civil design considered multiple private stormwater easements and extension of existing infrastructure.

Hutchinson Street, Burleigh Heads
Project for The Potter Group. Industrial warehouse facility.

Ozone Industrial Project, Chinderah
Northern NSW including design within a flood area and the subsequent stormwater management.

Burleigh Heads, Low-Impact Industry
Owen Consulting regularly consults on Industrial Development sites and can provide initial advice on site opportunities and constraints

Industrial Development - Paget
Detailed design of 2,020sqm industrial warehouse development including stormwater quality, carpark pavement specification, carpark grading and sewer / water connections.

Case St, Southport
Project for The Potter Group.

Flagstone Drive, Burleigh Heads
Project for The Potter Group

Township Drive, Burleigh Heads
Project for The Potter Group

Design & Construct - H/Duty Pavement
Design and construction of heavy duty pavement at BP service station, Mackay Harbour. Essential for the client to maintain operation of the service station throughout construction, therefore strict WHS adhered to during construction.

Design & Construct - VXO Heavy Duty
Use this section to explain a set of product features, to link to a series of pages, or to answer common questions about your products. Add images for emphasis.

Landfill Remediation - Middlemount
Detailed design of D&C landfill remediation project in consultation with project environmental consultant and local Council.